Protocol Overview
Verification workflow (aligned with Eskom verification protocols).
This is an overview only. The full protocol pack includes detailed measurement requirements, baseline durations, and reporting templates.
Baseline → Intervention → Review
TES verification relies on disciplined sequencing and stable operating conditions. The protocol formalises what must be measured and how results are interpreted.
Baseline Period
Establish stable operating conditions and collect baseline performance data.
Intervention
Apply TES treatment protocol and monitor system response.
Verification
Measure performance improvements and validate results.
Review
Independent engineering review and final reporting.
Minimum verification conditions
Stable load
Load variability should be constrained during baseline and intervention to avoid masking fouling effects.
Instrumented signals
TR, TTD, condenser vacuum, and cooling-water inlet/outlet temperatures must be reliable and logged.
Data governance
Dosing logs, operational constraints, and maintenance events must be recorded for audit-ready review.
Independent review
Independent engineering review is recommended for disputed outcomes or high-stakes decisions.
Protocol Pack
Request the full verification protocol pack, including templates, data requirements, and reporting guidance.